Fourth North Escambia FPL Solar Farm Planned South Of Bratt Road : NorthEscambia.com

Fourth North Escambia FPL Solar Farm Planned South Of Bratt Road : NorthEscambia.com

Florida Power & Light is proposing a fourth solar farm in North Escambia.

The “Mitchell Creek Solar Energy Center” would be located on 1,282 acres between Camp and Cox Roads, just south of Bratt Road and the Escambia County Road Department North Camp, according to plans obtained by NorthEscambia.com.

The proposed location is just northwest of the First City Solar Energy Center, located along Holland, Cox and Roach roads in McDavid. It is on track to go into operation in early 2023. The site will have more than 223,000 photovoltaic panels with a planned output of 75 megawatts.

The 300,000 solar panels at the Cotton Creek Solar Energy Center on Bogia Road near McDavid have been in operation since early 2022 and were officially dedicated in March. It produces….


Source link

About coldfusion

Check Also

Department of Energy To Revisit Cold Fusion – Space Daily

Department of Energy To Revisit Cold Fusion – Space Daily

[unable to retrieve full-text content]Department of Energy To Revisit Cold Fusion  Space Daily Source link

Leave a Reply

Your email address will not be published. Required fields are marked *